Install siding and trim products in compliance with local building code requirements for clearance between the bottom edge of the siding and the adjacent finished grade.
Hardiepanel vertical siding.
James hardie products should be stored in their original packaging.
Hardiewrap weather barriers.
Maintain a minimum 2 in.
Not supplied by james hardie waterproof membrane the installation of a breather membrane acting as a vapour permeable water barrier is necessary for timber frame buildings or block walls where the wall is not considered waterproof.
Hardiebacker cement boards.
James hardie will assume no responsibility for water infiltration within the wall.
Installing siding wet or saturated may result in shrinkage at butt.
Maintain a minimum 2 in.
Installing siding wet or saturated may result in shrinkage at butt joints.
Hardieplank lap siding.
100 acrylic topcoats are recommended.
Should this option be unavailable hardiepanel cladding with primeplus technology must be painted within 90 days of installation.
50mm clearance between james hardie products and paths steps and driveways.
And canada who are available to work with any contractor or builder.
James hardie is not responsible for damage caused by improper.
Protect edges and corners from breakage.
It is recommended that hardiepanel cladding with primeplus technology be factory coated by a third party establishment.
Install tech docs.
James hardie edge coating to touch up cut edges and small damages.
As a homeowner you will work with a contractor who will facilitate the installation of your james hardie siding trim soffit wrap and flashing products including products with colorplus technology.
Carry planks on edge.
Also by james hardie.
They must be kept off the ground on a pallet.
50mm clearance between james hardie.
Hardieplank lap siding is also available with colorplus technology as one of james hardie s prefinished products.
James hardie is the world leader in fiber cement siding and backerboard.
Also by james hardie.
We ve been providing a better way to build for over 100 years.
James hardie siding and trim products must be kept dry at all times prior to installation.
Store flat and keep dry prior to installation.
James hardie recommends the use of building paper type weather resistive barriers with all siding products.
Aspyre by james hardie.
Hardieshingle siding single family installation requirements hs1067 p1 8 04 18 store flat and keep dry and covered prior to installation.
See your local dealer for details and availability of products colors and accessories.